首页 > 专家团队 > 正文

Ouyang Bin
2018-06-09 16:28:36   来源:   评论:0 点击:

He has been engaged in oilfield production increase technology service industry for 13 years, specializing in providing technical analysis and solutions for increasing production of oil and gas wells, increasing injection of water wells, reducing costs and increasing efficiency, as well as coordinating the handover and implementation of measures He dominantly designed and implemented: water plugging plan for horizontal wells, integrated scheme of water plugging and sand control for high water-bearing oil wells, high-pressure low -permeability reservoir oil-water well plugging and adjustment scheme, repeated sand control scheme for heavy oil with steam injection in multiple rounds, low damage acid plugging solution for high pressure low permeability reservoirs and acidification - plugging - acidification scheme in buried mountain oil reservoir, etc At present, he is a technical engineer of the shared service center of production increase technology of Shandong Kerui Holding Group Co , Ltd

相关热词搜索:

上一篇:第一页
下一篇:Wang Fubing

分享到: 收藏